您当前的位置:首页 > 书籍 > U交通运输 > U2铁路运输

《高速铁路轨道工程施工技术规程(Q CR9605-2017)(英文版)》中国铁路总公司 编 中国铁道出版社 2017/1/1

高速铁路轨道工程施工技术规程(Q CR9605-2017)(英文版)

内容简介:

  This Specification was prepared based on Document TJS [2010] No. 241-TechnicaI Guide for Construction of High-speed Railway Track as per the requirements for establishing the engineering and construction standard system of CHINA RAILWAY,by summarizing the practical experience in high-speed railway projects that had been put into operation in earlier stage and the experience with CRTSIII slab track for Zhengzhou-Xuzhou High-speed Railway,Panjin-Yingkou High-speed Railway and Shenyang-Dandong High-speed Railway,absorbing the research results on CRTsrri slab track and extensively soliciting the opinions from different parties involved in construction and operationThis Specification comprises 20 chapters, namely General Provisions, Terms, Basic Requirements, Construction Preparations, Setting-out of Construction Control Network,Construction of Ballastless Track Bed for CRTS I Slab Track,Construction of Ballastless Track Bed for CRTS II Slab Track, Construction of Ballastless Track Bed for CRTs rri Slab Track,Construction of Ballastless Track Bed for CRTS Bi-block Ballastless Track, Construction of Sleeper-embedded Ballastless Track in Turnout Area, Laying of Slab Track in Turnout Area,Ballast Installation, Turnout Laying on Ballasted Track, Laying of Rail Expansion Joint,Construction of Transition Section,Laying of Sealing Layers between fracks and on Both Sides,Laying of Continuously Welded Rail (CWR) Track,Fine Adjustment of Track,Pre-grinding of RaiI,Setting.of Signs and Markers,and one appendix.

目录:

添加互助QQ群

加入互助QQ群,获取书籍相关资源和交流帮助,群号:330354268

试读查询

获取试读电子版,请规范使用。

免责申明: 本站仅提供书籍相关信息展示服务,不提供任何书籍下载服务。请购买正版,支持正版。所有资源信息均来源于网络,如侵权,请点击 侵权处理 ,我们第一时间删除处理。