您当前的位置:首页 > 书籍 > U交通运输 > U2铁路运输

《中国铁路总公司企业标准(Q/CR 9221-2015):铁路给水排水施工技术规程(英文版)》中国铁路总公司 编 中国铁道出版社 2016/4/1

中国铁路总公司企业标准(Q/CR 9221-2015):铁路给水排水施工技术规程(英文版)

内容简介:

  This specification is formulated to unify technical requirements for the construction of railway water supply and sewerage works, strengthen construction technology management and ensure construction quality.
  This specification is applicable to the water supply and sewerage works of new railways or renovated railways.
  Construction of railway water supply and sewerage works shall comply with national laws, regulations and relevant technical standards, and strictly conform to design documents. In the construction of railway water supply and sewerage works, the management system, personnel allocation, field management and process control, etc., shall be standardized, so as to achieve such construction targets as quality, safety, construction schedule, investment benefit, environmental protection and technical innovation.
  Mechanization, member prefabrication in plant, professionalization and informatization shall be actively promoted in the construction of railway water supply and sewerage works.
  The HSE (Health, Safety, Environment) management level shall be raised in the construction 9f railway water supply and sewerage works.
  If cultural relics protection organizations are involved, the railway water supply and sewerage works shall be constructed on the basis of relevant regulations and protection measures specified in design.
  In the construction of railway water supply and sewerage works, risk management shall be properly conducted in consideration of the actual site conditions and by means of risk planning, risk identification, risk evaluation, risk assessment and risk control, and specific construction schemes and emergency plans shall be established.
  Construction of railway water supply and sewerage works shall comply with relevant national laws, regulations and technical standards on resource saving, energy saving and emission reduction, and the technical measures for energy saving and emission reduction shall be formulated and implemented, taking into account engineering characteristics and construction environment.
  In the construction of railway water supply and sewerage works, the construction personnel shall receive training and pass examination before assuming the post.
  During railway construction9 relevant data shall be collected and sorted out in time, which shall be complete, real and accurate, and the archiving and management of the data shall be well performed in accordance with relevant requirements,
  Main equipment and materials used for the construction of railway water supply and sewerage works shall comply with relevant current national standards, industrial standards, and the standards of China Railway Corporation
  The railway construction clearance shall not be intruded by the installation of the trackside equipment of the railway water supply and sewerage works.

目录:

添加互助QQ群

加入互助QQ群,获取书籍相关资源和交流帮助,群号:330354268

试读查询

获取试读电子版,请规范使用。

免责申明: 本站仅提供书籍相关信息展示服务,不提供任何书籍下载服务。请购买正版,支持正版。所有资源信息均来源于网络,如侵权,请点击 侵权处理 ,我们第一时间删除处理。